Original Post, 4/21/08: Becker + Becker's "360 State" development on the former Shartenberg Site at the heart of Downtown New Haven is now beginning construction. An 8-foot high blue fence with concrete barriers has been erected around the complete perimeter of the block, and informational graphics along the length of the fence will be installed this week. Utility and site work has already begun, with a significant amount of underground work planned as part of the project. Major construction activity will be underway within the next few weeks.
Scheduled for completion in 2010, the 355-foot-tall tower will be the second-highest building in New Haven, bringing the residents of 500 new apartments to Chapel Street between Orange and State.
The site is conveniently located across the street from the State Street train station. Aside from its dense urban location, the development contains energy efficient design features. Elements like geothermal heating and cooling and solar cells, if used, would benefit from various state subsidy programs designed to promote energy efficiency. There will also be indoor bicycle parking spaces for each unit. The project also is planned to contain a massive ornament program, running the full length of the facade, designed by internationally-renowned New Haven-based public sculptor Kent Bloomer.
The 500-unit, 34-story building is designed to be set back from the street and tower above a retail and parking garage base with glass entrance towers. The project, tentatively called "360 State" for its actual street address as well as its panoramic views of the region (and the fact that it is 36 stories tall), will even feature a half-acre landscaped terrace (sitting on top of the parking) with an outdoor pool. The developer expects to get the same rents as what the 227 Church Street luxury building currently gets -- $3,500 for 3BRs, $2,300 for 2BRs, $1,700 for 1BRs and $1,250 for studios. Most of the building will consist of studios and 1BRs. 10% of units in the building will have subsidized ("affordable") rents tied to income level.
According to Business New Haven this week, a "high end" grocery store on the first floor may be leased shortly. The city hopes that the project will help encourage walkability between the Downtown New Haven core area and Wooster Square, a historic neighborhood just a couple blocks to the east of the site.
Click here for the preliminary renderings by Becker + Becker; updated renderings should be available shortly. In the meantime you can also download a CT Business article about the Downtown New Haven project.
Update 5/1/08: New Haven Independent coverage of the 360 State project appears here, along with a new rendering of the project. It appears that the building on the corner of Orange and Chapel Street has been changed from its original design, which was to have continued the retail and parking garage along the entire length of the block. If the building ends before the corner with Orange Street, it might create an opportunity for another developer or architect to create a concept for a second building on the site.
Thursday, May 1, 2008
500-unit Shartenberg Mixed-Use Development Begins Construction
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2008
(76)
-
►
June
(17)
- Shore Line East expands service
- Arts & Ideas Festival tours New Haven
- Momentum Builds for Bike-Friendly Union Station
- Citywide Petition for Safe, Livable Streets
- Van Gogh's Starry Night and Cypresses: together fo...
- OffManhattan: Nix Hamptons for New Haven
- Former New Haven Coliseum Site: Details on the RFQ...
- DNH Added to Livable Streets Network
- Cycling Activity vs. National Gas Prices
- Bike to Work: Bicyclist Appreciation Breakfast
- Arts and Ideas Festival Kicks Off
- Bicycles on Trains: Updated ... Again!
- Coalition: Remove Route 34 Relic, Rell!
- Stem Cells for Dummies
- One Floor, Two ECA Events
- New Materials in New Haven Architecture
- Walking Businesses to Downtown New Haven
-
►
May
(15)
- College Square Rendering Reveals RAMSA Influence
- Lieberman: Trains are for those who can't afford c...
- New Website: New Haven Safe Streets
- Harvard School of Public Health: High traffic redu...
- Green Drinks, Simple Pleasures, Pipas and Model Ci...
- Downtown Traffic Safety Event and Ride of Silence
- Northland Explains Plans for Coliseum Site
- Direct from London to New Haven
- National Train Day to hit New Haven Union Station
- SeeClickFix
- Downtown New Haven Unicycle Mania
- Postcards of New Haven
- City Receives Multiple Bids for Former Coliseum Si...
- Grand Theft Velo II: Elm City
- 500-unit Shartenberg Mixed-Use Development Begins ...
-
►
April
(23)
- Updated: Pedestrian fatality highlights safety iss...
- Lost City Mourns Yankee Doodle, Celebrates Perkins...
- Updated: Downtown New Haven “Export” Toasted
- Urban Poverty, Ethnography and The City
- Hollywood East
- Architects Taking Pictures
- Visualization Lecture
- Earth Day Bike Repair Party
- New Haven vs. Providence?
- New Haven Register: Reclaim Route 34
- Shore Line East ridership up 5.5%, Update: Metro N...
- Cherry Blossom Festival - Sunday
- Public Event: Re-creating a Community from the Oak...
- Private equity firms, restaurants, biotechs, video...
- 91 Church Street Saved?
-
►
June
(17)

0 comments:
Post a Comment